Project Metrics at a Glance

The Opportunity
Gulf Star Marina was designed to transform dry-stack boat storage by replacing forklifts with a fully electric, automated ASAR system, constructing a hurricane-rated concrete facility capable of withstanding 200+ MPH winds, and setting a new benchmark for speed, safety, and efficiency in the marine industry.
The Challenge
Before Gulf Star Marina, dry-stack marinas depended on forklifts and manual labor to move boats in and out of storage. This created bottlenecks such as:
- Limited storage efficiency
- Increased risk of damage
- High weather dependency
- Staff dependency
These issues resulted in little protection against hurricanes or extreme winds, leaving vessels vulnerable to severe storms. The marine industry needed a solution that could combine speed, safety, resilience, and operational efficiency.
The Project Process

Strategic Planning & System Selection

Engineering & Design

Construction & Integration

Deployment & Support
The Solution
Uses a fully electric lift system to move boats without forklifts.
Boats are stored and retrieved automatically via the ASAR system.
Tilt-wall concrete panels built to withstand 200+ MPH winds.
The automated system moves boats efficiently from racks to water.
The Results
Project Gallery
Want to Learn More?
Ready to plan, build, or evolve your marina? Connect with Marina Partners to discuss drystack development, marina infrastructure, or integrated waterfront projects—delivered with clarity, accountability, and long-term performance in mind.